Tank Installation

Delivery & Installation Methods To Suit All Requirements

  • Deliver, Offload, Position & Bolt-Down
  • Deliver & Offload
  • Deliver + Client To Unload
  • Ex. Works

We are able to offer a variety of installation methods, dependant upon the complexity of the tank system, and the end-user’s requirements.  

Ex Works supply

Client to collect and load the tank, using their own transportation and loading equipment.

Delivery of tank

Delivery of tank using Niplast’s transportation. Installation and set-up remains the responsibility of the client, including risk-assessments and associated methodologies. 

Deliver + offload from wagon

Delivery to site and removal of tank from delivery vehicle normally via hi-ab and or cranes. Lift is usually direct to an adjacent, prepared plinth (as provided by the customer).

Deliver, offload, position and bolt-down

Our most comprehensive method of delivery and tank installation. In addition to the above option, we will also position and bolt-down the tank to the plinth, using the required bolting procedure and resin application. We will also fit any additional access steelwork and interconnection lines. 

For expert advice on our tank installation options, get in touch or request a no obligation quote today.

Start a Conversation

    alternatively - speak to a technician

    01614776777

    GOING BEYOND THE STANDARD

    Today, with over 40 years of brand heritage, Niplast is an expert in manufacturing plastic bulk storage tanks or industrial tanks to strict CEN standard BS EN 12573 and its forerunner DVS 2205.

    Our long history of innovatively applying these standards to solve chemical storage problems sets us apart from other brands of underground water tanks and chemical storage solutions. Sometimes, you need to think outside of the tank!

    Contact Us
    Birds eye view on black tanks

    case studies

    Our Know-How In Action